| 9 | `2026-08-03-em-planner-rolling-execution-implementation.md` | Task 1 - Cycle Identity, Scheduling Decision, and Stale-Result Suppression | `d75380c` | RED: the authorized inherited coordinator draft threw `ObjectDisposedException` when a completed current cycle was followed by another cycle. GREEN: `coordinator` printed `PASS coordinator`; the exact 100-run planned loop completed with exit 0 and 100 PASS lines. |
| 9 | `2026-08-03-em-planner-rolling-execution-implementation.md` | Task 2 - Safe Previous-Trajectory Handoff | `55119de` | RED: `coordinator` exited 1 with missing `TrajectoryHandoffSelector` contracts. GREEN: `PASS coordinator` covers forward/reverse same-segment interpolation, age/tracking/terminal/segment/direction/beyond-trajectory/gear-boundary rejection, no cross-boundary interpolation, and coordinator consumption of its immutable published trajectory. |
| 9 | `2026-08-03-em-planner-rolling-execution-implementation.md` | Task 3 - Gear-Switch State Machine and Trajectory Executor | `de402e6` | RED: `executor` exited 1 with missing gear-switch and execution-state types. GREEN: `PASS executor` covers forward-to-reverse and reverse-to-forward zero-speed dwell, one-shot request, confirmation, and Goal/RollingSafetyStop completion. |
| 1 | `2026-08-03-em-planner-foundation-implementation.md` | Task 2 — Configuration, Diagnostics, and Request Validation | `b326431` | RED: `foundation` failed with missing configuration/validation types; GREEN: `foundation` printed `PASS foundation` twice with byte-identical stdout and exit 0. |
| 1 | `2026-08-03-em-planner-foundation-implementation.md` | Task 3 — Direction Segmentation and Exact Boundary Anchors | `e492e16` | RED: `segmentation` failed with missing `ReferencePathSegmenter`; GREEN: `foundation` and `segmentation` each printed their PASS line with exit 0. |
| 4 | `2026-08-03-em-planner-osqp-backend-implementation.md` | Task 4 — OSQP Solve Lifecycle and Status Mapping | `a957fda` | RED: `osqp-loader` failed with missing `OsqpNativeSolver`; GREEN: fixed bounded, equality, infeasible and one-tick time-limit QPs pass inside a copied clean-plugin process. Status values 1–11 map to the planner-neutral contract, with finite metrics and captured native status. Twenty exact `osqp` solve/cleanup cycles printed `PASS osqp-solve` and `PASS osqp-loader` on every iteration. |
| 4 | `2026-08-03-em-planner-osqp-backend-implementation.md` | Task 5 — Backend Completion Gate | `61dfa79` | RED: `osqp` was rejected by the verification-host command parser; GREEN: it runs the full solver/loader group. README now records the pinned package, deployment layout, absolute-load rule, ownership and status mapping. `dumpbin /dependents` found only Windows/runtime DLLs; an externally located working directory still loaded a copied clean plugin bundle and solved the micro QPs. |
| 5 | `2026-08-03-em-planner-lateral-ls-implementation.md` | Task 1 — Variable Layout and Exact Discrete Lateral Dynamics | `c225b17` | RED: `lateral-model` failed to build with missing `LateralVariableLayout`; GREEN: `PASS lateral-model` covered contiguous `4N-1` indices, range checks, unequal-S exact integration, station/corridor/start validation, defensive copies, and the lateral result publication contract. |
| 5 | `2026-08-03-em-planner-lateral-ls-implementation.md` | Task 2 — Normalized Objective and Linear Hard Constraints | `f703d41` | RED: `lateral-model` failed to build with missing `LateralObjectiveBuilder`; GREEN: `PASS lateral-model` inspected normalized P/q coefficients with `1e-12` comparisons, exact integration equalities, finite hard bounds, goal/gear versus rolling terminal behavior, empty-intersection early failure, and the solver-neutral fake-QP boundary. |
| 5 | `2026-08-03-em-planner-lateral-ls-implementation.md` | Task 3 — Nonlinear Geometry Evaluation and Independent Validation | `0c48a7d` | RED: `lateral-model` failed to build with missing `LateralGeometryEvaluator`; GREEN: `PASS lateral-model` covered straight and constant-curvature references in forward/reverse, full Frenet curvature, actual strictly increasing PathS, curvature/yaw-rate signs, and rejection of denominator, curvature, non-finite, and independently recomputed world-geometry violations. |
| 6 | `2026-08-03-em-planner-lateral-ls-implementation.md` | Task 4 — Sequential Convex Outer Loop and Feasible-Candidate Fallback | `f19df53` | RED: `lateral-integration` failed to build with missing `SequentialConvexOptimizer` and `LateralPlanner`; GREEN: `PASS lateral-integration` scripted validation-before-fallback, invalid-vector rejection, `SolvedInaccurate` residual/geometry rejection, 0.05 m trust centering, complete-primal warm starts, five-call cap, cancellation, timeout and facade behavior. |
| 6 | `2026-08-03-em-planner-lateral-ls-implementation.md` | Task 5 — Real-OSQP Lateral Scenarios and Gate | `4d83ed2` | RED: `lateral-all` reached the real forward scenario but rejected the empty initial warm start; the subsequent loader diagnosis confirmed the host output bundle intentionally lacks `osqp.dll`. GREEN: the solver-neutral full initial primal and a clean copied plugin-bundle probe produced `PASS lateral-model`, `PASS lateral-integration`, and `PASS lateral-real-osqp` for deterministic forward/reverse straight, gentle curve, seed-connected obstacle narrowing, gear-switch, and rolling scenarios. |
- Commands: `coordinator`; `executor`; `em-core-all`; `trajectory`; `lateral-all`; `optimization`; `osqp`; `all-foundation`; `git diff --check`, all from the repository root.
- Result: all Stage 9 exit commands exited 0 at `de402e6`. The coordinator binds caller-supplied time and complete cycle identity, publishes only current immutable successes, and isolates sink exceptions. Handoffs use immutable published points or the supplied measured state. The executor receives caller time, measured speed, direction inputs, and exact boundaries; it has no UI, hardware, current-working-directory, controller-command, or dynamic-obstacle dependency.
- RED/GREEN: Task 1 RED `coordinator` exit 1 (`ObjectDisposedException`), GREEN exit 0 plus the 100-run loop exit 0. Task 2 RED `coordinator` exit 1 (missing `TrajectoryHandoffSelector`), GREEN exit 0. Task 3 RED `executor` exit 1 (missing execution types), GREEN exit 0.
- Result: The Stage 5 `lateral-model` gate exited 0 after all three Task commits. It proves the `4N-1` layout, exact unequal-station dynamics, immutable lateral inputs/results, normalized OSQP-convention P/q assembly, finite hard corridor/derivative/trust/denominator bounds, terminal distinction, full forward/reverse world reconstruction, actual PathS, and independent validation. `optimization`, `osqp`, and all four `all-foundation` groups exited 0. The dependency list remains `KERNEL32.dll`, `VCRUNTIME140.dll`, and API-set CRT DLLs only—no MKL, CUDA or external QDLDL. `git diff --check` had no whitespace diagnostics; immediately before this checkpoint update the staging area was empty and no Stage 5 scope files were uncommitted.
- Result: Stage 6 exit commands all exited 0 at `4d83ed2`: `lateral-integration`; `lateral-all` (model, scripted SQP, and clean-plugin real OSQP groups); `optimization`; `osqp`; `all-foundation`; and `git diff --check`. The real OSQP gate runs every fixed scenario twice and compares status, point count, and all lateral-path numeric fields within `1e-10`; the obstacle scenario stays in the negative, seed-connected corridor interval. The LS implementation remains dependent only on `IQpSolver`/`QuadraticProgram`; no LS P/Invoke, UI, hardware object, or current-working-directory dependency was added.
- Result: Stage 7 exit commands all exited 0 from the repository root at `510bf97`: `longitudinal-model`; `longitudinal-integration`; `lateral-integration`; `lateral-all`; `optimization`; `osqp`; `all-foundation`; and `git diff --check`. ST consumes only actual LS `PathS` and reaches OSQP only through `IQpSolver`/`QuadraticProgram`; no ST P/Invoke, UI, hardware object, or current-working-directory dependency was added. The jerk-stop case retains only the independently validated initial seed when OSQP reaches its 4000-iteration limit; the timed-out solver vector is not accepted.
- Baseline note: invoking the pre-existing `lateral-all` test from the `ClumsyPilot` subdirectory fails its pinned-DLL lookup because that Stage 6 test constructs the source path from `Directory.GetCurrentDirectory()`. Running the documented command from the repository root exits 0. Stage 7 does not modify or bypass the completed LS test.
- Normal-project baseline: the historical checkpoint recorded exit 1 from legacy `auto_avoidance/MultiWheelAutoAvoidance.cs` references to `NetTopologySuite` and `OpenCvSharp`. At the Stage 7 final read-only audit that source path is absent from both the working tree and the tracked `HEAD` tree, so `dotnet build ClumsyPilot/ClumsyPilot.csproj --no-restore` exits 0 with only two unrelated obsolete-API warnings. Stage 7 issued no delete/clean command and made no legacy-module change; preserve the observed workspace and do not recreate, delete, hide, or otherwise alter legacy functionality merely to change this baseline.
- Result: Stage 8 exit commands all exited 0 from the repository root at `019b896`: `em-core-all` twice (each printed `PASS longitudinal-model`, `PASS longitudinal-integration`, `PASS trajectory`, `PASS em-planning-service` in order); then `longitudinal-model`, `longitudinal-integration`, `trajectory`, `lateral-all`, `optimization`, `osqp`, `all-foundation`, and `git diff --check`. The trajectory gate independently verifies physical world-space publication and the service consumes only request snapshots through `IQpSolver` / `QuadraticProgram`; no Stage 8 production P/Invoke, UI, hardware, current-working-directory, dynamic-obstacle, rolling-execution, or controller dependency was added.
- Stage 8 RED commands and exits: Task 4 `trajectory` exit 1 (missing `EmTrajectoryAssembler`); Task 5 `trajectory` exit 1 (missing validator contracts); Task 6 `em-planning-service` exit 1 (missing `EmPlanningService`). Task 4/5 GREEN command was `trajectory` exit 0 / `PASS trajectory`; Task 6 GREEN command was `em-core-all` exit 0 twice with the required four PASS lines.
- The initially untracked Task 1 coordinator draft was explicitly authorized for Stage 9 ownership and committed as `d75380c`.
- Every other captured Stage 9 user-baseline status entry remains untouched and unstaged; no unexpected loss or new non-stage status entry was found.
- The pre-existing `lateral-all` fixture remains root-directory dependent for its pinned OSQP DLL; no completed LS/ST/OSQP/facade behavior was changed.
- Existing baseline noise remains the two obsolete-API warnings and CRLF advisories on user-owned dirty files; `git diff --check` exits 0.
- The workspace continues to contain the same unrelated Map, CoarsePath, PathSmoothing, project-file, report, and documentation changes captured at Stage 6 entry. They belong to the user and remain untouched and unstaged.
- The historical legacy `auto_avoidance/MultiWheelAutoAvoidance.cs` dependency failure is not reproducible in the Stage 7 final workspace because that untracked/unversioned source path is absent. Do not recreate, delete, bypass, or otherwise alter legacy functionality to manufacture a different baseline.
- Remaining observed baseline noise: the first fresh Stage 8 core build printed the existing `Lidar2dDetect2LegTray.LegWidth` and `MultiWheelChassis.GetSteerWheels()` obsolete-API warnings; `git diff --check` emits CRLF conversion advisories for user-owned dirty files but exits 0. Neither is an EM Planner regression.
- Confirm branch `trajplanner`, `a957fda`, `61dfa79`, `c225b17`, `f703d41`, `0c48a7d`, `f5c69c2`, `f19df53`, and `4d83ed2` are ancestors of `HEAD`, and the Stage 6 progress checkpoint is present.
- Authorized tasks only: Task 4 - Generic Control Adapter; Task 5 - Plugin Output and License Packaging; Task 6 - Rolling End-to-End and Final Gate.
- Entry checks: confirm `d75380c`, `55119de`, `de402e6`, and this Stage 9 progress checkpoint are ancestors of `HEAD`; capture and preserve `git status --short` with an empty index; run `coordinator`, `executor`, `em-core-all`, `trajectory`, `lateral-all`, `optimization`, `osqp`, and `all-foundation` from the repository root.
- Exit gate: Tasks 4-6 each have independent RED/GREEN and commits; `em-all` and `git diff --check` exit 0; the stage-10 progress update is committed alone and no Stage 11 prompt is generated.